Monday – Friday, 09:00 – 18:00 (UTC+3) WhatsApp

Manufacturing & Factories

MRO, consumables and operating materials supply for factories.

Request a Quote
Short answer

How is MRO supply planned for a factory?

In production plants the deciding factor is not unit price but downtime risk. That makes the plan two-layered: critical and single-source items are held in stock or committed with a written lead time; the non-critical majority is consolidated with one supplier to cut transaction count. Standardising item descriptions removes duplicate stock and wrong-part risk.

A factory’s procurement team may need to order bearings, gloves, toner and sugar for the tea station in the same week. A separate supplier, negotiation and invoice for every line — operational load grows and strategic work suffers.

AKSCO consolidates all your non-production (indirect) purchases under one roof. From maintenance consumables to operating materials, you work with a single account, consolidated invoicing and one contact. For critical consumables, minimum-stock agreements help us manage line-stoppage risk together.

Three requirements most often written wrong

In a production plant most purchasing is repeat consumables, which is exactly why an error lasts for years. These three are the conditions most often missing or out of date in specifications.

Numerical requirements in production plants in Türkiye
SubjectRequirementBasis
Trigger for supplying hearing protectionLower exposure action value: LEX,8h = 80 dB(A) or ppeak = 112 Pa · upper action value: 85 dB(A) or 140 Pa · exposure limit value: 87 dB(A) or 200 PaRegulation on the Protection of Workers from Risks Related to Noise, Official Gazette 28.07.2013 / 28721, Article 5. The purchasing trigger is 80: at 80 protection is provided, at 85 its use becomes mandatory
Slip-resistance code on safety footwearToe protection ≥ 200 J impact and ≥ 15 kN compression. The SRA/SRB/SRC codes were withdrawn; slip resistance is now given by a single SR marking. Ø is not a slip grade — it marks outsoles exempted from the test (studded or cleated)EN ISO 20345:2022 (ISO 20345:2021). Certificates issued under the older edition run until they expire, so SRC-marked footwear stays on the market for a while yet; even so, write SR rather than SRC into a new specification, or newly certified products fall outside it
Testing lifting equipment and pressure vesselsLifting and conveying equipment: once a year, tested at at least 1.25 × the declared load. Pressure vessels: hydrostatic test at 1.5 × working pressureWork Equipment Regulation, Official Gazette 25.04.2013 / 28628, Annex III

The regulation also names who may sign the inspection: the relevant engineer, technical teacher, technician or senior technician. Settle that before you buy the service.

Most requested in manufacturing

  • Bearings, belts, filters and MRO consumables
  • Safety equipment and workwear
  • Industrial cleaning and hygiene products
  • Hand tools and maintenance equipment
  • Electrical materials
  • Packaging and shipping consumables
  • Canteen and refreshment products
  • Administrative office needs

Frequently Asked Questions

Other industries: Energy & Power Plants · Multi-Branch Organizations. Industry pages group the same items by where the work happens; to browse by material instead, see product categories, and the free calculators for the quantity decisions.

How fast can you respond during a breakdown?

For urgent requests we check availability first and report what can be found the same day. To be straight about it: not every part can be found quickly — when it cannot, we write the equivalent options and the real lead time rather than an optimistic date.

Can you help build a critical spare parts list?

Yes, working from your equipment list and past failure records. We classify items by downtime impact and lead time, then set a reorder point for each: average consumption during the lead time plus a safety margin sized to how variable that consumption is.

Can different categories go on one order?

Yes. MRO, PPE, cleaning and office items can share a list and be met with one quote, one shipment and one invoice.

Can periodic maintenance materials be planned ahead?

Yes, and this is the most efficient way to work. Share the maintenance calendar and items are priced in advance, with long-lead items ordered in time.

Do you ship outside Türkiye?

Yes. We deliver across all 81 provinces of Türkiye and arrange export shipments abroad. On export orders the delivery term is agreed at quotation stage under Incoterms 2020 — EXW, FCA, CPT or DAP — and the quote states which party arranges and pays for carriage, and where our responsibility ends. Country of origin, HS code and any conformity documents needed for export are settled at the same stage.

What does an export quote include, and what does it not?

It includes the goods, export packing where required, and carriage up to the point defined by the agreed Incoterm. It does not include destination-country duties, taxes or customs charges — those sit with the buyer. Cargo insurance is not automatic under EXW, FCA, CPT or DAP; if you want it arranged, say so in the request and it appears as a separate line. Turkish VAT is zero-rated on exports once export clearance is completed.

Is there a minimum order for an export shipment?

There is no fixed minimum, but freight economics set a practical floor: on a low-value single-line order, carriage can exceed the value of the goods. Consolidating several categories into one shipment is usually what makes an export order worth placing — which is the same reason our buyers consolidate domestically. Tell us the delivery country and we will say honestly whether the freight makes sense before you spend time on a specification.

These three questions are the same on every category and industry page. The full answer — Incoterms, the document set and ISPM 15 packing — is in our export shipping guide.

Why AKSCO?

Supply built so the line keeps running

  • Supplier consolidationOne account, one contact, one invoicing rhythm instead of dozens of vendors.
  • Downtime preventionMinimum-stock agreements and emergency supply for critical consumables.
  • Food/production fitFood-safe chemicals and certified products matching your industry.
  • Shift-friendly deliveryDeliveries planned around your shift pattern to avoid interrupting production.

Sources

  1. Regulation on the Protection of Workers from Risks Related to Noise (Çalışanların Gürültü ile İlgili Risklerden Korunmalarına Dair Yönetmelik) — Official Gazette 28 July 2013, no. 28721, Article 5
  2. Regulation on Health and Safety Conditions in the Use of Work Equipment (İş Ekipmanları Yönetmeliği) — Official Gazette 25 April 2013, no. 28628, Annex III (EK-III)
  3. EN ISO 20345:2022 (ISO 20345:2021) — Personal protective equipment: safety footwear (CEN–ISO; the standard text is copyrighted)
  4. EN 458 — Hearing protectors: recommendations for selection, use, care and maintenance (CEN; the standard text is copyrighted)

How we choose sources, verify figures and date our pages is set out in how we source and verify what we publish. Spotted an error? Write to info@aksco.com.tr — verified errors are corrected.

How this typically runs — an illustrative scenario

A mid-size food factory consolidates indirect materials previously sourced from 14 suppliers into AKSCO. A monthly replenishment calendar is set; procurement moves from dozens of orders per month to a single approval flow, and invoice traffic drops to one account.

Send your needs list — your quote is ready within 1 business day.

Quotes are free of charge and carry no purchase obligation. Requests received during business hours (Mon–Fri, 09:00–18:00 Türkiye time, UTC+3) are processed the same day; those arriving outside them go to the front of the queue the next business morning.

Request a Quote Average first response: same business day